AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
This construction project, located at the Fulton Work Center, Sequoia National Forest, consists of removal of existing 7 inch casing, well slab, pump house and redrilling a vertical well with installation of new 8-5/8 inch casing, annular (grout) sea | Type: Presolicitation | Sol#: RFQ-R5-13-02-86
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
This project consists of Road Surface and Drainage Stabilization. Reconditioning of Roadbed and drainage structures, Clearing, Aggregate Surface Placement, Culvert Installation, Placement of Hand-Placed and Machine-Placed Riprap, and Misc. erosion c | Type: Presolicitation | Sol#: RFP-R5-15-02-58
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
This construction project, located on the Sequoia Nationl Forest, is for 13 accessible parking sites, accessible and non-accessible pathways, construction of 13 living area sites, purchase and installation of 13 grills, tables and fire rings. Constr | Type: Presolicitation | Sol#: RFP-R5-13-02-91
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
This Call-When-Need requirements contract requires providing sanitation units and services for incident personnel for the Sierra, Stanislaus and Sequoia National Forests. | Type: Presolicitation | Sol#: RFP-R5-15-02-57
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
Type: Presolicitation | Sol#: RFQ-S-05-SS-13-07-250
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
Purchase 4 each Brush Chipper with 115 horse power engine per special specifications plus options: 1). Spark arrester muffler. 2). Rotating amber warning light. Delivery to 3 different locations on Forest. | Type: Presolicitation | Sol#: RFP-R5-13-03-111
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
This project, consists of the hazardous waste removal/Disposal from five different sites including pick-up,packaging,profiling, manifesting, transporting & treatment or disposal. For Additional Information contact Larry Trueblood at (559) 784-1500 X | Type: Presolicitation | Sol#: RFQ-R5-13-03-21
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
This project includes providing recreation area and campground signs | Type: Presolicitation | Sol#: RFQ-R5-15-03-136
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
This Snow Removal Project, located on the Sequoia National Forest, consists of: 1.) Quaking Aspen Campground entrance, group campground parking area, snowmobile ramps, toilet access pathway, and administrative parking. 2.) 0.2 of a mile of Tulare Co | Type: Presolicitation | Sol#: RFQ-R5-15-03-48
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
**MODIFICATION NOTICE: Solicitation will not be posted to the web. If you wish a package send a fax referencing sol.# to 559-294-4833. Response date has been changed to 4/3/2003 by 2:00 p.m.***This contruction project involves the storm proofing of | Type: Presolicitation | Sol#: RFP-R5-15-03-61
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
Note: Response Date is estimated Bid Opening Date.This project consists of snow grooming, Hwy 108. A) Snow grooming Hwy 108 from winter closure to ennedy Meadows Road. 18.5 miles. B) Snow grooming FS Rd 5N01 (Eagle Meadow Rd) from Hwy 108 to Eagle | Type: Presolicitation | Sol#: RFQ-R5-15-03-007
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
Purchase and installation of a multi-line remote control dispatch console system (total of 4 positions)for use by the Stanislaus National Forest in a two-way mobile radio system, shall provide all the necessary functions to operate conventional FM tw | Type: Presolicitation | Sol#: RFP-R5-13-04-107
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
Construction of approx. 0.10 mile of paved paths and the construction of a stage; consisting of excavation, placement of aggregate base and hot bituminous pavement, concrete stairs and railings. Project is located on the Summit Ranger District, Stani | Type: Presolicitation | Sol#: RFQ-R5-15-03-118
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
This Construction project consists of decommisioning 0.95 miles of road by installing water bars, recontouring and subsoiling and the reconstruction of 1.16 miles of road entaling a culvert installation, dip construction and some rocking. The estima | Type: Presolicitation | Sol#: RFQ-R5-15-03-110
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
This construction project is located on the Hot Springs Unit of the Sequoia National Forest. The project includes aggregate surface course placement on approx. 0.4 miles of single lane road, construction of a vehicle turn around, removal and re-inst | Type: Presolicitation | Sol#: RFQ-R5-13-03-112
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
This construction project is located at the Fraser Flat Campground on the Stanislaus National Forest. Work consists of reconstructing camping sites and spurs to meet the ADA standards. It will also include accessible access to 2 new restrooms. Proj | Type: Presolicitation | Sol#: RFP-R5-15-03-113
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
***MODIFICATION TO CHANGE SECONDARY POINT OF CONTACT ONLY TO: ROXIE MYERS 559-297-0706 EXT. 4831.*** The USDA Forest Service Region 5, Pacific Southwest, intends to do a Streamline Competition Cost Study to perform trail opening, maintenance, constru | Type: Presolicitation | Sol#: RFP-R5-13-03-131
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
Amendment 1 changes email address for quotation submission. | Type: Presolicitation | Sol#: AG-9A40-S-13-0024
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
See attached solicitation See Amendment No. 1 | Type: Combined Synopsis/Solicitation | Sol#: AG-9A40-S-15-0012
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
Type: Solicitation | Sol#: RFQ-R5-15-03-90
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
The Contractor shall provide all services to create, maintain and update, and create new sections of the Sequoia National Forest World Wide Web site at www.fs.fed.us/r5/sequoia . It is expected that | Type: Solicitation | Sol#: AG-9A40-S-10-0001
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
Type: Solicitation | Sol#: RFP-R5-15-04-37A
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
Rental of 8-4WD compact pickups; 4- 2WD pickups; 3-4WD SUV's, Jeep Cherokee or equivalent for period of 120 days. 52.212-12 Evaluation--Commercial Items (Jan 1999), Delete the requirement Paragraph (a). Award will be made on price alone. Firms tha | Type: Presolicitation | Sol#: RFQ-R5-13-02-93
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
This project, located on the Mi-Wok Ranger District,Stanislaus National Forest, consists of reducing fuels by removal or mastication of small conifers on approximately 850 acres. The estimated start work date is May 31, 2002 | Type: Presolicitation | Sol#: RFP-R5-15-02-38
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
This project, located on the Mi-Wok Ranger District, Stanislaus National Forest, consists of reducing fuels by chipping and removal of small conifers on approximately 350 acres. The estimated start work date is June 28,2002. | Type: Presolicitation | Sol#: RFP-R5-15-02-39
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
Establish plots and measure tree canopy cover, live trees, dead trees, understory vegetation, down logs and fuelbed in 6 giant sequoia groves. For technical questions contact Lewis H. Jump at 559-784-1500 exten 1161. Solicitation requests can be fa | Type: Presolicitation | Sol#: RFQ-R5-13-02-97
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
MODIFICATION NOTICE: RESPONSE DATE HAS CHANGED TO JULY 26, 2002. NOTE: THIS SOLICITATION WAS PREVIOUSLY ADVERTISED AS RFP-R5-15-00-62. ALL SOLICITATION REQUESTS FROM THAT NOTICE WILL BE APPLIED TO RFP-R5-15-02-22. This Granite Stewardship Project | Type: Presolicitation | Sol#: RFP-R5-15-02-22
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
This project, located on the Bass Lake Ranger District, Sierra National Forest, consists of mechanical thinning/release/and Site preparation for tree planting on 559 acres. The contracting officer is Gilbert Massiatt (559) 297-0706 ext. 4835. For t | Type: Presolicitation | Sol#: RFP-R5-15-02-095
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
This Mechanical Shredding project, located on the Groveland Ranger District, Stnislaus National Forest, is to mechanically thin overstocked conifers and reduce fuels in brush land and forest as well as facilitate reforestation in stands by mechanical | Type: Presolicitation | Sol#: RFP-R5-15-02-113
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
This project is located on the Sierra National Forest and consists of groom snow on the following snowmobile trails: Huntington Lake Trail (10 mi), Willow Hill Trail (3mi), Dowville Trail (1mi), Mushroom Rock Trail (7mi), Kaiser Pass Trail (16mi), M | Type: Presolicitation | Sol#: RFQ-R5-15-03-13
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
***CORRECTION TO SOLICITATION NUMBER. CORRECT NUMBER SHOULD READ RFP-R5-15-03-10. PREVIOUS INQUIRIES NEED NOT RESPOND TO THIS CHANGE***This project, Aerial Straw Mulching, located on the Sequoia National Forest, is a result of the McNally Fire. Thi | Type: Presolicitation | Sol#: RFP-R5-25-03-10
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
CANCELATION NOTICE: SOLICITATION RFP-R5-15-03-36 IS CANCELED. Conduct analysis and complete NEPA documentation via EIS/ROD to address management needs of approximately 7,000 acres of badly damaged or destroyed conifer habitat that happened as a resu | Type: Presolicitation | Sol#: RFP-R5-15-03-36
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
Type: Presolicitation | Sol#: RFP-R5-15-03-59
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
THIS MODIFICATION IS TO CHANGE THE APPROXIMATE ACRES FROM 456 TO 252 ACRES. Hand thinning and hand piling of approximately 456 acres,located on the Sierra National Forest, High Sierra Ranger District. Estimated contract time is 86 calender days. Es | Type: Presolicitation | Sol#: RFP-R5-15-03-03
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
Type: Solicitation | Sol#: RFP-R5-15-03-042
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
***MODIFICATION NOTICE: THIS PROJECT WILL BE AWARDED TO AN 8-A CONTRACTOR.***This Tree Planting Project, located on the Bass Lake Ranger District, Sierra National Forest, consists of auger Planting of Approximately 59,900 Trees and Hoedad Planting o | Type: Presolicitation | Sol#: RFQ-R5-15-03-43
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
Type: Presolicitation | Sol#: RFP-R5-15-03-046
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
Type: Presolicitation | Sol#: RFP-R5-15-03-47
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
Type: Presolicitation | Sol#: RFQ-R5-15-03-77
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
Type: Presolicitation | Sol#: RFQ-R5-15-03-67
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
Type: Presolicitation | Sol#: RFQ-R5-15-03-76
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
Type: Presolicitation | Sol#: RFQ-R5-15-03-96
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
Type: Presolicitation | Sol#: RFP-R5-15-03-121
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
Type: Presolicitation | Sol#: RFP-R5-15-03-120
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
This Fuels Reduction project is located on the High Sierra Ranger District,Sierra National Forest. It consists of Mastication/Thinning of up to 197 acres. Estimated contract time is 112 calendar days. Estimated start work date is July 7,2003. ESTI | Type: Presolicitation | Sol#: RFQ-R5-15-03-95
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
Location of this project can be obtained by calling Julie Roberts @ (559) 877-2218 Ext. 3159. This project consists of tractor piling of approximately 285 acres.Approximate Contract time is to start July 14, 2003 and should take approximately 98 day | Type: Presolicitation | Sol#: RFQ-R5-15-03-106
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
THIS SOLICITATION HAS BEEN CANCELLED.....TRACTOR PILING OF THINNING, LOGGING SLASH AND SPECIES ON APPROXIMATELY 153 ACRES. DOZER MUST BE EQUIPPED WITH A BRUSH RAKE. | Type: Presolicitation | Sol#: RFQ-R5-15-03-64A
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
***MODIFICATION TO CHANGE SECOND CONTACT TO GLORIA TAYLOR***The purpose of this project is to accomplish precommercial thinning and subsequent residue treatment in conifer plantations and natural (second growth) stands using hand tools or hand held m | Type: Presolicitation | Sol#: RFP-R5-15-03-129
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
Type: Solicitation | Sol#: RFP-R5-15-03-130
AGRICULTURE, DEPARTMENT OF / FOREST SERVICE / Sierra National Forest
Dry Tons Biomass - This project will remove small live trees, 4" to 10" DBH, as well as all snags less than 16" DBH from the designated units. This will complete the fuels reduction work in this area that was logged a few years ago. The trees will | Type: Presolicitation | Sol#: RFP-R5-15-03-105