Description
This project has been awarded to H2O Guam JV in the amount of $97,995,000.00. The award amount includes $79,300,000.00 for CLIN 0001 (Base Bid); $7,500,000.00 for CLIN 0002 (Bid Option 1); $680,000.00 for CLIN 0003 (Bid Option 2); $9,800,000.00 for CLIN 0004 (Bid Option 3); $250,000.00 for CLIN 0005 (Bid Option 4); $315,000.00 for CLIN 0006 (Bid Option 5); $150,000.00 for CLIN 0007 (Bid Option 6). The work to be performed provides for the repair and modernization of Lima Wharf and associated facilities at Naval Base Guam, to include comprehensive civil, structural, mechanical, utilities, fire protection, electrical, and telecommunication repairs. In addition to superstructure work on the deck and bulkhead, structural repairs will include installation of replacement sheet pile and site soil stability improvements. Mooring hardware will also be replaced. Site utility system repairs include potable water, storm sewer, sanitary sewer, steam system connections, bilge and oily waste water system connections, replacement of the electrical power substation and power mounds, ship-to-shore and lighting electrical distribution, and installation of telecom duct banks, fiber optic lines, and supervisory control and data acquisition system. Environmental site mitigation and monitoring will be provided as required during dredging and sheet pile work.