Steam Plant A, Boiler #2 Burner and Refractory Repair
FA9101-10-B-0009ContractRFPSAM.gov
Quick Facts
NAICS
238290
Set-Aside
Full & Open
Place of Performance
ARNOLD AFB, TN
Description
Arnold Air Force Base has a requirement to provide all plant, labor, material, equipment, and transportation necessary to: (1) replace the burner ring and burner ring refractory and (2) water jet the tubes for Boiler #2 at Arnold Air Force Base TN, S